Consultancy Projects Undertaken

MoU Signed Between CLRI and various Municipalities and Corporations (GOVERNMENT OF TAMIL NADU) on Biogas into Bottling Technologies using the Anaerobic Co-Digestion Of Organic Municipal Solid Waste and Industrial Solid Waste

Scope of the Consultancy Projects:

1)  To maximize the biogas and power yield in the existing biogas plant

2)  To inventories the failure analysis of existing biogas plant

3)  To prepare novel anaerobic seed sludge based on substrate and reseeding the exiting anaerobic digester.

4)  Maintain the anaerobic seed sludge for emergency purposes

5)  To inventories the source emission of organic municipal solid wastes with real time percapita waste generation

6)  Quantification of Biochemical Methane Potential / tone of Municipal solid waste and Bio-CNG potential feasibility for the whole city

7)  Preparation of Expression of Interest, and Request for Proposal (RfP) and detailed tender Document for the whole city

8)  To help municipalities and corporations to develop BOOT based Bio-CNG and Biomanuring technology

9)  To help execute the Bio-CNG plant with purification and bottling

10) To adopt increased bio-CNG utilization in Automobiles

List of Consultancy Projects MoU Signed by CSIR-CLRI and Municipalities, Corporations and Private Industries

Districts / Cities Present Capacity Upgradation Capacity / Proposed Capacity
CSIR CLRI and Kumbakonam Municipality (Project Cost= 6.0 Lakhs) 77 m3 DPR for the upgradation sewage sludge digester in to solid waste digester for biogas into bottling
CSIR-CLRI and Tiruchirappalli Corporation (Project Cost= 6.0 Lakhs) 5 TPD DPR for the upgradation sewage sludge digester in to solid waste digester for biogas into bottling Proposed for 100 TPD (Site to be selected)
CSIR-CLRI and Tiruppur Corporation (Project Cost= 6.0 Lakhs 10 TPD DPR for the upgradation sewage sludge digester in to solid waste digester for biogas into bottling 10 TPD to 15 TPD and Proposed for 100 TPD plant (Site selected)
CSIR-CLRI and Erode Corporation (Project Cost= 6.0 Lakhs) 10 TPD DPR for the upgradation sewage sludge digester in to solid waste digester for biogas into bottling 10 TPD to 15 TPD and Proposed for 50 TPD plant (Site to be selected)
CSIR-CLRI and Kanchipuram Municipality (Project Cost= 6.0 Lakhs) 5 TPD 5 DPR for the upgradation sewage sludge digester in to solid waste digester for biogas into bottling TPD to 10 TPD
CSIR-CLRI and Thanjavur Corporation (Project Cost= 6.0 Lakhs) 5 TPD DPR for the upgradation sewage sludge digester in to solid waste digester for biogas into bottling 5 TPD to 10 TPD
CSIR-CLRI and TATA INTERNATIONAL LEATHER Pvt LTD- DEWAS (Madhya Pradesh) (Project Cost= Rs 25.00 Lakhs) 25 TPD Preparation of DPR and execution of Bio-CNG plant at TATA International Private Ltd using leather solid waste and OFMSW to produce Bio-CNG to operate cars and busses
For Further Information Please Contact

Head, Environmental Science Lab

CSIR-Central Leather Research Institute,
Adyar, Chennai - 600 020
Tel: +91 44 24437211
E-mail: pshanmugham@clri.res.in